April 2011 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 -
Blog Posts
- Painting finally begins
- Soundboard Installation!
- Installing the Rose
- The Soundboard
- Adding the hook to the 8′ cherry Bridge
- 8′ cherry Bridge steamed, bent, clamped
- Bridges and Nuts
- Color/Paper samples for Harpsichord
- Soundboard joined and fitted
- Finally some new Harpsichord work
- Building a Flute & Whistle Library
- A Guitar Foot Stool
Pau Hana ‘Ukulele
Boston Balalaika
Monthly Archives: April 2011
The Bentside and the Bottom
Continued fairing the first side of the bent-side jig. The first side is extremely close to the drawing. I used the first side as a guide for the 2nd side, then cut the 2nd side out, screwed both together and … Continue reading